Ashby De La Zouch Tunnel

Derelict Places

Help Support Derelict Places:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

BikinGlynn

Super Moderator
Staff member
Moderator
Supporting Member
Veteran Member
Joined
Jun 7, 2014
Messages
3,068
Reaction score
4,995
50387302767_0c8431d4fd_c.jpg


Just a short one from here with not many pics (yeah u heard that right) dropped by here with my lad a few months back but didnt venture far in as it all seemed a bit the same tbh.

The entrance is enchantingly overgrown & we did manage a bit of excitement being chased by a farmer when we left.


50387303902_39a39b9589_c.jpg


The history shamelessly nicked from an old report

Ashby Tunnel was originally opened as a tunnel in 1804, As a cheaper way of connecting the Coventry canal from Bedworth to mining districts around Moira, Leicestershire than extending the Canal.

Work on the tunnels cutting was authorised in 1799 and It was a requirement that the tunnel's walls at the sides must be a minimum of 18" thick, the arch 13" and the invert 9". The width of the tunnel was also required to be 11 feet wide. Traffic first passed through the tunnel in late 1802. Two years later, the possibility of creating a shaft to provide more light in the tunnel was looked into but thats as far as it went.

In 1845 the Midland Railway came along, looking to remove any possible competitors from the Leicestershire coalfields, and bought the Ashby canal for @£110,000 (roughly @£12,000,000 in todays money). They immediately worked towards building a line from Swannington and Leicester, at Coalville, through Moira to the newly acquired Birmingham-Derby route at Burton upon Trent. There was a clause however, "keep the canal intact and in good repair for the purposes of trade until the completion of the railway and as long after as may be deemed expedient". After 20 years, The Midland obtained an Act to extend its Worthington branch into Ashby-de-la-Zouch where it would meet up with the Leicester-Burton line. The majority of this was laid on the track bed of the Cloud Hill Tramway, only coming away from the tramway in places where they needed to realign the line to ease curvature. The tunnel was rebored to be able to have a standard gauge line to run through it. As well as widening the tunnel, the workmen shortened the tunnel at its western end. When it reopened as a rail link, it was just 308 yards long.

The section of track from New Lount Colliery to Ashby-de-la-Zouch, passing through the tunnel, lost its usual traffic prior to the second world war but used by the Army. The route returned to the London Midland Scotland Railway (LMS) on 1st January 1945 but traffic didn"t return. The last train through the tunnel looks as though it was a rail tour on 28th June 1952 and the tunnel had its second official closure on 9th may 1955.

So there u have it, its a tunnel, here are the pics

50387128071_38d361ee46_c.jpg


50386430073_35dfdb47c9_c.jpg


50387303217_1d4f9df2fd_c.jpg


50387127421_c86d0b4cdf_c.jpg


50387128606_9e1e3a1659_c.jpg


50387127866_c5ff1b4934_c.jpg


50387126446_a3d866035e_c.jpg


Thats ya lot!
 
If this was a train tunnel, where is the track gone? (I'm new to this website so sorry if I ask obvious questions :) )
 
If this was a train tunnel, where is the track gone? (I'm new to this website so sorry if I ask obvious questions :) )

Welcome. If you search for railway tunnel you will find 70% like this.
Its quite a rare thing in fact to find an abandoned one with track still in as with most the thousands of miles of unused railway tn our country the track is usually pulled up for scrap value or reuse.
 
Thanks BikinGlynn :)

Yes of course, scrap makes sense, I mean there is a van that comes to my street every week to collect old washing machines so big thick rail track is probably gold (no pun intended) even though it must be hard work to get it all out...
 
Thanks BikinGlynn :)

Yes of course, scrap makes sense, so big thick rail track is probably gold (no pun intended) even though it must be hard work to get it all out...

Not really, A special consist of bogie bolster wagons was used and the crew really knew their job. Actually spent many hours monitoring dust and airborne pollutants during track renewals/removals in confined spaces.
 

Latest posts

Back
Top