I visited for the first time back in April you can see that report here
I was off work a few weeks back with not a lot to do and as it is only 5 minutes away, I decided to go back for another look.
I was amazed to see how much more trashed it has got inside in such a short time.
There is a planning application for a cash & carry and other outlets to be erected on the site.
It will be pulled down soon, which will be a shame as it is quite a good looking red brick building under the steel cladding that was bolted on to the front and one side of the building when Nastech took ownership.
Upstairs offices, the suspended ceiling will not be suspended for much longer.
I was off work a few weeks back with not a lot to do and as it is only 5 minutes away, I decided to go back for another look.
I was amazed to see how much more trashed it has got inside in such a short time.
There is a planning application for a cash & carry and other outlets to be erected on the site.
It will be pulled down soon, which will be a shame as it is quite a good looking red brick building under the steel cladding that was bolted on to the front and one side of the building when Nastech took ownership.
Upstairs offices, the suspended ceiling will not be suspended for much longer.