- Joined
- Oct 14, 2013
- Messages
- 3,243
- Reaction score
- 12,105
Visited here with man gone wrong and janovitch.we looked at the first tunnel which is a public footpath and cycle path.but I would not want to cycle down it.its dark and uneven.we then crossed over the bank and made our way to the closed tunnel.after a bit of a squeeze we were in.the closed tunnel is slightly longer and curved too.the tunnel was built in 1859 to serve the line between Northampton and market harborough.the second tunnel was built later,records show they are both of the same length but I still think the closed is longer.the tunnels were known as the rat holes by the drivers due to the small bores.
The closed tunnel
The closed tunnel