Nothamtonshires disused railway tunnels

Derelict Places

Help Support Derelict Places:

This site may earn a commission from merchant affiliate links, including eBay, Amazon, and others.

alex76

Veteran Member
Veteran Member
Joined
Apr 2, 2011
Messages
649
Reaction score
1,035
Location
bedfordshire
Hay folks myself and chris34 give these sites a visit a couple of weeks ago.
Now unfortunately at some point I managed to delete most of the days explore photos when loading my camera into my bag taking with it all my images I had saved on my memory card so I will share with you the ones I did manage to get.

The first tunnel we visited was Catesby tunnel
bit of history
Originally planned as a cutting, its existance is due entirely to the owner of the Catesby Estate who did not want unsightly trains blotting his landscape.
The 2,997-yard structure was cut by T Oliver & Son of Horsham as part of the Great Central's 'London Extension' construction contract No.4.
Its creation demanded round 290,000 cubic yards of mining. Work to sink the first shaft began on 18th February 1895 and the last length was keyed in on 22nd May 1897 - a remarkably quick average rate of 110 yards per month. Progress was greatly accelerated by the use of Ruston steam navvies (cranes).
The tunnel was mostly driven from nine construction shafts, each equipped with wooden headgear which was used to lower materials to the men working beneath.

In 1906 there was a accident where a high speed train travelling at 60 mph was derailed due to a faulty rail which there was 2 injuries and no deaths.

Catesby Tunnel retired from operational service on 3rd September 1966


IMG_7530_zps6b84686e.jpg



IMG_7522_zpsaf61b566.jpg



IMG_7520copy_zpseef88974.jpg



IMG_7517_zps646aca94.jpg



IMG_7523_zps748959bb.jpg



how she looked when under construction

gcrcs174_zpsfd0d3be0.jpg



gcrcs161_zpsa510b2b3.jpg



gcrcs153_zps1a5ed638.jpg



gcrcs122_zpsd6fb07da.jpg



he second tunnel was the second bore of oxendon tunnels which is now used as a public footpath and cycle route
bit of history
Oxendon tunnel which has two bores was designed and built by George Stephenson and was opened in 1859. It was built to connect Northampton and Market Harborough and was used to transport passengers and the huge amounts of ironstone that were found in Northamptonshire in the mid nineteenth century. It see its last train in 1981


IMG_7692_zps5c491408.jpg



IMG_7682_zps2e0ebdb3.jpg



IMG_7689_zps6b2b413b.jpg



IMG_6792_zpsabb2a212.jpg



thanks for looking ;)
 
God I love railway stuff (I said that in public didn't I).. great report, will head there myself one day
 
Back
Top