An outfall culvert intersects the main sewer at 45 degrees via an intersection chamber,
this discharges excess sewerage to the Moss brook during bad conditions.
The outfall culvert consists of a 400 yd, 1.5 mte wide brick pipe.
The main sewer consists of a long, 2.1 mte wide brick pipe which widens through the intersection chamber.
On the left the works 5 sewer merges with the works 6 sewer via tumbling steps,
passes through the intersection chamber & continues west through a redundant penstock.
Theres a new concrete screening chamber half way along the outfall culvert,
during bad conditions excess load pours across the weir & along the outfall culvert
the screening chamber then filters the exctera eg (allows the water to pass through) which continues to the Moss brook.
The original culvert is intersected by 10 ft concrete wall,
this along with 2 penstocks maintains the levels & acts as a detention tank.
main sewer & intersection chamber
penstock controls
redundant penstock
merging of works 5 (right) & 6 (left) sewers
outfall culvert between intersection chamber / weir & screening chamber
inspection chamber
screening chamber
10 ft concrete wall & detention tank
2 penstocks used for maintaining the level & forming a detention tank
ladders, walkways & controls
pump
inspection chamber
outfall culvert between screening chamber & Moss brook
outfall
at street level
thanks
this discharges excess sewerage to the Moss brook during bad conditions.
The outfall culvert consists of a 400 yd, 1.5 mte wide brick pipe.
The main sewer consists of a long, 2.1 mte wide brick pipe which widens through the intersection chamber.
On the left the works 5 sewer merges with the works 6 sewer via tumbling steps,
passes through the intersection chamber & continues west through a redundant penstock.
Theres a new concrete screening chamber half way along the outfall culvert,
during bad conditions excess load pours across the weir & along the outfall culvert
the screening chamber then filters the exctera eg (allows the water to pass through) which continues to the Moss brook.
The original culvert is intersected by 10 ft concrete wall,
this along with 2 penstocks maintains the levels & acts as a detention tank.
main sewer & intersection chamber
penstock controls
redundant penstock
merging of works 5 (right) & 6 (left) sewers
outfall culvert between intersection chamber / weir & screening chamber
inspection chamber
screening chamber
10 ft concrete wall & detention tank
2 penstocks used for maintaining the level & forming a detention tank
ladders, walkways & controls
pump
inspection chamber
outfall culvert between screening chamber & Moss brook
outfall
at street level